
Executive Director of Project Management Nuclear Business Development Leader
Mike comes to SI following tenures at Westinghouse Electric and Framatome. During his 25 year

Mike comes to SI following tenures at Westinghouse Electric and Framatome. During his 25 year

By: Dick Mattson and Minghao Qin A U.S. BWR utility contracted with Structural Integrity (SI)

By: Mark Jaeger and Andrew Crompton Acoustic resonance is a phenomenon in which an acoustic

By: Erica Libra-Sharkey INDUSTRY CHALLENGE From the US Department of Energy, Office of Nuclear Energy,

By: Bill Weitze 100% of thermal stress was treated as nonlinear gradient stress and linear

By: Scott Chesworth, Bob Grizzi, and Dilip Dedhia Optimizing the inspection interval for high-reliability components

By: Dave Gerber and Terry Herrmann Environmentally-Assisted Fatigue (EAF) screening is used to systematically identify

By: Curt Carney As plants enter their initial or subsequent license renewal period one of

By: Wendy Weiss and Terry Totemeier Structural Integrity (SI) personnel visited a power plant construction

By: Ben Ruchte and Kane Riggenbach To provide operating flexibility, combined cycle plants are typically