
Process Upsets – Condition Analysis
MATERIALS LABORATORY CASE STUDY 5 THE PROBLEM A filter was removed from a stator cooling
MATERIALS LABORATORY CASE STUDY 5 THE PROBLEM A filter was removed from a stator cooling
MATERIALS LABORATORY CASE STUDY 4 THE PROBLEM Structural Integrity received a section of an original
MATERIALS LABORATORY CASE STUDY 3 THE PROBLEM Structural Integrity received several sections of core reinforcing
MATERIALS LABORATORY CASE STUDY 2 THE PROBLEM A manufacturer noticed recent material provided by a
MATERIALS LABORATORY CASE STUDY 1 THE PROBLEM A small metallic particle that had contaminated a
Structural Integrity’s Own, Andy Coughlin published by American Society of Civil Engineers, ASCE Andy Coughlin’s
By: Daniel Peters (SI) and Thomas Pastor (HSB Global Inspection & Engineering Services) A recent
By: Scott Chesworth (SI) and Bob Grizzi (EPRI) The goal was to determine whether the
By: Wendy Weiss Soot blower erosion (SBE) is caused by mechanical removal of tube material
By: Jason Ven Velsor, Roger Royer, and Ben Ruchte Tubing in conventional boilers and heat-recovery