Tag Archive for: PHSMA

News & Views, Volume 49 | Mission Critica-nApplications to Support the Mega-Rule

News & Views, Volume 49 | Mission Critical Applications to Support the Mega-Rule

News & Views, Volume 49 | Mission Critica-nApplications to Support the Mega-RuleBy:  Scott Riccardella, Bruce Paskett, and Steven Biles

On October 1, 2019, the Pipeline and Hazardous Materials Safety Administration (PHMSA) published amendments to 49 CFR Parts 191 and 192 in the Federal Register, issuing Part 1 of the Gas Transmission Mega-Rule.  This new regulation is commonly referred to as the Mega-Rule since it represents the most significant regulatory impact on gas transmission pipelines since the original Gas Transmission Integrity Management Program (TIMP) Regulation was issued in 2003

The original Notice of Proposed Rulemaking (NPRM) issued in April, 2016 was split into 3 Parts, with the first Part (Mega-Rule 1) including specific requirements to address congressional mandates in the 2012 Pipeline Safety Reauthorization, and other pipeline safety improvements, including:

  • Maximum Allowable Operating Pressure (MAOP) Reconfirmation (§192.624),
  • Material Verification (MV) (§192.607),
  • Engineering Critical Assessments for MAOP Reconfirmation (§192.632),
  • Analysis of Predicted Failure Pressure (§192.712),
  • Assessments Outside of High Consequence Areas (HCAs) (§192.710),
  • Additional Requirements to Evaluate Cyclic Fatigue (§192.917(e)(2)), and
  • Additional Analysis of Electric Resistance Welded (ERW) Seam Welds (§192.917(e)(4))

READ MORE